MultiRoundBAGRS.jpg
Bay Area Garden Railway Society
 

Construction underway

02/19/2010 12:34 PM | Anonymous member (Administrator)
Here's what under the liner will look like:
IMG_2010.JPGLiquid Nails glues the foam board together and to the plastic storage box. This will lighten the trailer load and provide a place to store the jack and tire iron.

The final foam board is being glued onto rails of foam over which the hills will run.


Inside the storage box is an 8' tray that pulls out onto the open gate whenever we need to access the tools.


At the end of the box we will display a portal from which will emerge a point-to-point G-scale mining engine automatically reversed with DC current from the battery on the rails. This will be the only track powered train.

Copyright (c) 2007-2017 Bay Area Garden Railway Society, Inc., a 501 c(7) Not-for-Profit Social Club

Powered by Wild Apricot Membership Software