MultiRoundBAGRS.jpg
Bay Area Garden Railway Society
 

Cliff development/ Last call for building help

01/25/2011 8:49 PM | Anonymous member (Administrator)
This side of the trailer looks like it's about to be operated on.  You are looking at the trailer side which has been raised to make the side level while we work on it. Triangular plywood gussets support the road bed. We now have the geodesic scenery made and we'll begin applying the sections of the fake rock to the trailer side to make the cliffs. At the same time the roadbed half loop in front needs to be attached to the side so a mounting system needs to be fabricated. Same for the rear of each side.

Our goal is to have trains running on this loop by February 26 at the annal meeting. We sure could use your help. This may be your last chance to work on this historic layout.
Contact nunorris@aol.com with times that work for you to help.


Copyright (c) 2007-2017 Bay Area Garden Railway Society, Inc., a 501 c(7) Not-for-Profit Social Club

Powered by Wild Apricot Membership Software